Shaping the Future of Energy. WorldWide.

eDREAM post

EV
eDREAM post

EV charging smart management to balance the electric grid in a condition of high penetration of distributed generation from renewable energy sources

Following the advent of distributed generation, the electric grid underwent an essential change in power flows. The grid had been designed and developed based on the fact that energy had a unidirectional power flow. Electricity had to be produced in massive power plants from which, through the high voltage (HV) network, the energy had to be transmitted into the consumption areas, where it would reach the end-user, through the medium voltage (MV) network and the low voltage (LV) network.

Read more